Installation of Rooftop Units

 

New 500,000 sq. ft. manufacturing facility’s roof top units set utilizing a 550 ton crane configured with 148′ of main boom and 240′ of luffing jib.

 

 

 

A total of (45) Heating, Ventilation and Cooling Units were set.

 

 

 

 

(80) Sections with and average weight of 5,500lbs

 

 

 

 

Utilized (3) Day Lift Plan with three Crane Set-ups

Guys,
Everyone was very pleased and impressed by the quality and dedication shown during the shutdown. Sorry it had to be pushed over the holidays, but everyone came through with flying colors. Thanks again for the tremendous effort.

Thank You.

Michael Peisher, P.E.
Michelin DPPI/MPA/GE/US0/201B

Installation of 1/2 x 12′ Standard Shear

Installed 1/2 x 12′ Standard Shear in shop area.

Calpine Broad River Energy Center Storm Pond Modification

Calpine contracted Keystone Constructors to build a new storm pond outfall structure that would help them contain any spills to the site and prevent them from getting to the Broad River. The team faced numerous challenges, which included scorching temperatures of 95+ degrees for almost the entire length of the project. There was also the challenge of getting the prefabricated sections to the site which was down a steep and narrow embankment. The team did an excellent job of constructing the structure while maintaining the environmental surroundings and working in a safe manner at all times. The project went off without a hitch and considering the obstacles faced it was a great team effort by Keystone! 

Jay V. Youmans, O & M Manager

 

Chad,

Thank you again for providing the “A Team ”  to repair and refab our tanks. David & Lee were very responsive and understanding of our safe working atmosphere and helped us out tremendously on short notice. When you have time please send me a bill/quote for the work completed on Wednesday 10/13. Thank you for doing business with us, your team is a great asset to have available!

 Thank you for your time in advance.

300 Ton Press Brake Installation

Installed 300 Ton Pacific Brake Press in fabrication shop.

Richard,

Thank you for the delivery and labor today for the 2 new platform spacers. Everything was there as quoted and Bobby & Jeffrey were very cooperative to work with. We take “Safety” very seriously here and they were very willing to follow by the rules and all working activities were done safely. It was a pleasure working with you on this project and we at DSM commend the great workmanship and cooperation with our “Safety Plan” at the sight.

Thank you for your time and leadership with a tight deadline to meet,

David Bok | Plant Support/Training Coordinator | DSM Functional Materials

15KV Cable Repair

Recent repair of 15KV cable that failed due to water intrusion.  The failure caused shutdown of areas of the plant.  Repair was completed promptly, and process was running again smoothly in a timely manner.  Pictures below show the damaged cable and the progression of the repair.

Damage was caused by water intrusion of the cable over a period of many years.        Damage was caused by water intrusion over a period of years.

       

Chemtura Tank

Fabricated and installed a 12,000 gallon stainless steel caustic tank per API 650. 

Welding process used was mig flux core.  Size of completed tank was 10′ in diameter and 20′ tall.             

 

 

 

 

 

ASME Code Work

Installed 6″ Nozzle on Code Vessel Man-Way.